A full-value second home. On your own plot.
For anyone who does not want a temporary solution, but a real home for your parents, your child or yourself. 46 m², one or two bedrooms, all on one level and completely independent.
You are looking at impressions (3D renders). The first Aventura Large is being built. Once it stands, we will show real photos.
- Meets the Dutch Building Decree (Comfort and Prestige)
- 16 weeks of production
- 1 to 2 days to place



For anyone who wants to live close by, without giving up privacy, comfort or value.
Living on one level and independently, with you just a few metres away.
Their own front door instead of years of searching in a gridlocked housing market.
Care close by, with privacy for both sides. More comfort than a care unit.
Downsizing to one level, in a place that already feels like home.
One or two bedrooms. You decide.
The same outer size, two layouts. Every square metre put to good use.

Ideal for one person or a couple who value comfort and space.

Perfect for living together or care within the family.
This is how you live in it.




3D impressions. Photos of the first built Aventura will follow.
Warm in winter. Cool in summer.
Without heavy installations or high energy bills. The Aventura is built on passive-house design principles and natural materials.
A vapour-open, biobased building system and ventilation with heat recovery and a CO2 sensor.
Compared with a similar, traditionally built new home. With a heat pump from Comfort upwards. Solar panels (10 panels) are an option in your quote.
Every home gets a certified blower door test before it leaves the factory.
Three finishing levels. One constant quality.
You choose how far we finish the home. All prices include VAT and exclude transport and foundation.
Shell
For anyone who wants maximum freedom in the finishing.
- Wind and watertight, biobased and vapour-open
- Timber window frames with triple glazing
- Ventilation with heat recovery
- Airtight, with blower door test
You finish it yourself. That is why Essential does not yet meet the Building Decree and the warranty is limited.
Technically complete
For anyone who wants the technology taken care of, with freedom in the finishing.
- Everything from Essential
- Bathroom with toilet
- Heat pump for heating and cooling
- Boiler and individually controllable climate zones
- Finished walls, colour from 5 shades
Meets the Building Decree. You choose the kitchen and floor.
Turnkey
For anyone who wants to live there right away, without coordinating or finishing anything.
- Everything from Comfort
- Kitchen with Pelgrim appliances, 3 styles
- PVC click floor in 6 choices
- Automatic screens
- Lighting inside and on the facade
Meets the Building Decree. All that is left is moving in.
Clear in advance. So nothing surprises you.
We take care of
One point of contact, from first check to key.
- Design and production in the factory
- Checking in advance with the crane company whether placement is possible, free of charge
- Transport and lifting
- Placement on your plot, usually in 1 to 2 days
- Connecting to the utilities and handover
You take care of
We show you the way and share all documents.
- The foundation; we introduce you to a foundation company
- Utility lines up to 1 metre from the facade
- An accessible spot for the crane truck and low-loader
- The permit, if one is needed. You receive the architectural documents free of charge

“It has been worth every euro. No draughts, always cosy and extremely low heating costs.”Roel and Joyce van Remmen, residents of one of our biobased homes in Houten
Reserve your place. No obligation.
In 2027 we build twenty homes, deliberately no more. The first one is sold. Whoever signs up first, is scheduled first. The waiting list applies to all models.
- Free and without obligation
- The order of signing up determines your place
- We call you ourselves to go through your situation
- Unsure about your plot? Message us first, or sign up straight away
Sign up for the waiting list
So we can help you properly. It takes about two minutes.
Questions about the Aventura Large.
Your question not here? Message us. You get an answer from us, not from a call centre.
On working days usually an answer within a few hours
Is the home an extension?
No. Every Aventura is a self-contained home with its own front door, kitchen and bathroom. It stands apart from the main house.
How quickly will the home be on my plot?
After your order we build the home in 16 weeks in the factory. Placing it on your plot usually takes 1 to 2 days. The foundation and connections are already in place by then.
Is this home allowed on my plot?
That depends on your plot and your municipality. The Aventura is designed to be able to qualify as permit-free: 3 metres high, flat roof and well under 100 m². Dutch rules for a permit-free family home are expected to change on 1 January 2027, but that is not guaranteed. Until then, permanent residence in an extra home usually requires a permit. You apply for that permit yourself. We share the architectural documents you need free of charge. Message us your plot details first.
What is the difference between the packs?
With Essential you finish the home yourself. Comfort is technically complete with bathroom, boiler and heat pump (solar panels are an option in your quote), and you choose the kitchen and floor. Prestige is fully finished, including kitchen, floor and automatic screens: all that is left is moving in.
How does the waiting list work?
You sign up free of charge and without obligation. The order in which you sign up determines when it is your turn. We call you to go through your situation and walk through the next steps together.
Do you build outside the Netherlands?
We deliver in the Netherlands and Belgium. Interested from elsewhere in Europe? Message us and we will look at what is possible.

A home of your own. In a place that already feels like home.
Start with the question that decides everything: can it go on your plot? Message us the details and we tell you what we see, without a sales call.
